After we put in the offer on the house, I fired up my architectural CAD package (of which I have several, all quirky in different ways) and drew the floorplan as I remembered it. I then figured out how to add what we wanted to the basic plan without going so far as breaking the whole place down and rebuilding.
It’s scary how close that original floorplan I drew matches the place, once we took possession and measured everything and CADded it up. (pic <- background is my original drawing, foreground the rough actual measurements).
But we looked at the place, and firstly Tamsyn’s room (Bedroom 3) was frightfully small, and secondly there’s a huge big electrical box of frogs on the wall where I wanted to break through to extend the main bathroom.
So plans B and C were hatched, plan B being that the existing activity room (which started out life as a single garage) becomes the main bedroom, with Tamsyn going into Jessica’s room (Bedroom 2) and Jessica going into the main bedroom, and plan C involving building. Which relies on plans being approved. Which may or may not (with a large bias towards “may”) lead to old age terminating the waiting process.
OK, Plan B it is. The existing activity room is 6100 x 3050. We want a queen size bed, cupboard space, and a full bathroom (bath, separate shower, toilet, and of course a basin). Plans B-A, B-B, B-C, and so forth, and so on, were hatched. We’re currently on B-lostcount, somewhere around H.
Stay tuned to our exciting programme to find out whether we can fit all these elements into the available space!
1 Response
[…] along the way we decided to make the activity room into our main bedroom. The smallest of the three bedrooms would then become Tanya’s scrapbooking room. Which of […]