Teardrop update

So it came to pass that Tanya and I decided to go to the Kruger National Park. Over December, which is not the best of ideas, but that’s how it worked out. It might turn out to be somewhat hot.

Accommodation up there is rather expensive, with camping being by far the cheapest option. And since we have a teardrop, we are set.

Except that the teardrop needs a bit of work.

TeardropRoof

The lexan expands a lot more than wood, so when it gets hot the entire roof pulls up. This breaks the seal, of course, and when it rains I get wet. I don’t like getting wet.

Also, I never completed the galley and inside cupboards*.

RoofOff

I decided to shorten the see-through part of the roof, taking it from the front to the top, not over towards the back. I’ll have to drill bigger holes through the lexan to allow it to float, and use weatherstripping rather than trying to glue it down.

Template

Here I am using my l33t template skilz so that I can cut two pieces of ply to the right shape.

20151029_072717r

Puzzling about the layout. No, three drawers won’t fit.

20151101_141731r

(And a lot of cutting and screwing later) — Looking good.

Update 2015-12-05

So I’ve been procrastinating with the second door. It’s a major PITA. But it had to be done so…

P1110193r

As with the first door, I first bolted the hinges to the panel and then cut the door out. I tried to transfer the dimensions from the other side as accurately as possible.

P1110248r

Trimmed the hole with the same aliminium T section, and then ran into a problem. Because when I went to buy more aliminium, they were no longer there. And I couldn’t find the same thing anywhere else. Found something similar at the fourth place I looked, it just had to do.

So the trim on the second door is kind of iffy.

P1110251r

P1110252r

Let’s go.

** The Atma Travelear is somewhat above my competence level.

Share