tiling

Happy Anniversary

Today, a year ago, we took possession of the house. It’s been… a journey. A long one, and we’re still on it.

Maybe it’s time for the long awaited kitchen sink backsplash post. Frank finished the tiling and grouting last Friday, but I’ve been somewhat busy, so blogging had to wait.

Drip tray hardware from A&D Distributors in Maitland.

We invited some people over on Saturday evening, so the rush was on to finish the bathroom shelves (only way I get things done, invite people over :-)

These rods are also from A&D…

..and this is what they look like installed. Since this particular wall consists of tile over shutterboard, I just drilled a hole and used a 6mm bolt from the other side to hold the rod to the wall.

For the shelf on the other side, I used two lengths of 12mm aliminium angle, cut and filed and drilled. This is where I noticed that the whole thing is completely out of square, the tiler could have done a lot better.

I still have to change the bath… *sigh* but it’ll be nice when it’s done. And Tanya wants “her” light on the same circuit as the downlighters, there’s a DB in the ceiling, I just have to get up there…

I would have liked to go and see the Kontiki rafts, but driving to the Fruit & Veg in Bellville to buy snack-ey party stuff, and putting up the shelves, took my whole day. OK, I also spent an hour at the range early on Saturday but that doesn’t count :-) Found a pretty good 7mm TC/U cast bullet load. Subject of another posting, maybe.

Monday evening sunset, straight off the camera, no Photoshoppery.

Sometimes I think I’m too lazy…

In this specific instance, too lazy to deal with finding and hiring a professional tiler, so I’m getting Frank to do the tiling. Which means that I have to tell him exactly what to do. Which means more work and stress for me, not less.

In order to not cut the tiles next to the window on the right, Frank inserted the thin strip of tiles in the middle. He’s good at thinking outside the box like this sometimes, but I don’t like it. So he’s re-doing it my way.

On the other hand, we had a “professional” tiler at Amperbo. And he didn’t do the job right, in my opinion, either.

And Frank listens to what I tell him to do, whereas the professional dude might not.

See? I can justify anything :-)

The wooden box I built behind the bath, shimmed to be exactly one tile high. This determined the level all the way through — in other words, Frank had to start two tiles lower on the wall in the first picture, making sure that he lined up with the top of the bath to bring the line through onto this box. I think figuring this out took him a whole day.

Tanya and I marked three places where we wanted the spotter tiles. This is not one of them. But it works.

Frank broke the first spotter he tried to fit into this position, so I went off to buy two more spotters this morning, one to replace the broken one and one to replace this one, which will stay. R90 each. !.