bathroom

Sometimes I think I’m too lazy…

In this specific instance, too lazy to deal with finding and hiring a professional tiler, so I’m getting Frank to do the tiling. Which means that I have to tell him exactly what to do. Which means more work and stress for me, not less.

In order to not cut the tiles next to the window on the right, Frank inserted the thin strip of tiles in the middle. He’s good at thinking outside the box like this sometimes, but I don’t like it. So he’s re-doing it my way.

On the other hand, we had a “professional” tiler at Amperbo. And he didn’t do the job right, in my opinion, either.

And Frank listens to what I tell him to do, whereas the professional dude might not.

See? I can justify anything :-)

The wooden box I built behind the bath, shimmed to be exactly one tile high. This determined the level all the way through — in other words, Frank had to start two tiles lower on the wall in the first picture, making sure that he lined up with the top of the bath to bring the line through onto this box. I think figuring this out took him a whole day.

Tanya and I marked three places where we wanted the spotter tiles. This is not one of them. But it works.

Frank broke the first spotter he tried to fit into this position, so I went off to buy two more spotters this morning, one to replace the broken one and one to replace this one, which will stay. R90 each. !.